My days off 08 and 09 September 2002

Purchased gravel for a shed project I am working on. Sadly the person who delivered the 3 yards of gravel did not dump it where I needed it. She said she had to dump it where she did thus adding to the amount of labor required by me.

see photo gallery below for where I decided to place gravel instead of where my original plan was to us it. There were some low spots that needed gravel to keep form having puddles.

whats left of the 3 cubic yard pile

What I did on my day off. 4/15/2020

I worked on my lawnmower. First I replaced the filter and was looking into the primer bulb being bad possibly, the mower started and ran after 2-4 pumps but cut right out. I was looking for direction online on how to replace the bulb and found a video of my exact problem. It was such an easy fix I was able to do it. One of the holes in the nut at the bottom of the carburetor was plugged up.

I could not find my vise grips so used a chips bag clip to pinch off fuel line.

I will share link here. https://www.youtube.com/watch?v=Gy–7hcBFps